On-call schedules
Decide who Maple pages and when: rotations in layers, overrides for a swapped shift, what happens in a gap or when someone leaves, and a calendar feed of the shifts.
An on-call schedule answers one question: who gets paged right now. People take turns in a rotation, and an escalation chain pages whoever the schedule says is on call when its step comes up.
Schedules live under Alerts → On-call. Org admins and engineers can create and change them. Everyone in the org can read them.
Create a schedule
- Open Alerts → On-call and select New schedule (Create schedule while there are none).
- Name it, and pick its Time zone. Handoff times and restrictions are read in that zone, whatever zone each person is in.
- Add a layer: the people on it, in rotation order, and when they hand off.
- Select Create schedule at the bottom of the form.
The preview under the form draws the weeks ahead as you type, and marks any stretch where nobody is on call.
Layers
A layer is one rotation. A schedule can have up to 5.
| Field | What it does |
|---|---|
| People, in rotation order | Who takes turns, up to 50. Each person holds the layer until the next handoff. |
| Hand off | Daily at a time, weekly on a weekday and time, or every given number of hours. |
| Only active in these windows | Limits the layer to weekly windows, such as weeknights or weekends. Without one it is always on. |
Later layers sit on top of earlier ones wherever they have someone on call. That is how a “weeknights” layer covers the nights and leaves the days to the layer below it. The Final schedule row of the calendar shows the result: the person who is actually paged.
Overrides
An override puts one person on call for a time range, over every layer. Use it when someone swaps a shift or covers for a colleague.
- On a schedule’s page, select a shift in the Final schedule row, or Add override.
- Pick who covers and from when to when. An override can last up to 90 days.
- When two overrides overlap, the one made last wins.
Deleting an override hands the time back to the layers.
Gaps
A gap is a stretch with nobody on call: a restriction leaves it open and no other layer covers it. The on-call list and the schedule’s page both name the gaps of the next 14 days.
A chain step that pages a schedule in a gap reaches nobody. Maple writes that on the incident’s timeline and moves straight to the chain’s next step. See When a step reaches nobody.
When someone leaves the organization
A person who leaves stays in the rotation until you edit it, but can no longer be paged:
- Their shifts pass to the next person in the rotation order who is still in the organization. When nobody in the layer is, those shifts go uncovered and count as a gap.
- Their overrides are ignored.
- The schedule’s page and the on-call list name them, so you can take them out of the layer.
Calendar feed
A schedule can hand out a private link that calendar apps subscribe to. It shows the schedule’s shifts from a week back to 60 days ahead, named after who is on call. Every handoff starts a new event, so a rotation with one person in it still shows a shift per rotation. A long override is one event with its real start and end.
- Open the schedule and find Calendar feed at the bottom of the page.
- Select Create calendar link and copy the link. It is shown once.
- Add it to your calendar app as a subscription by URL (in most apps: add calendar, from URL).
The link works without signing in, so anyone who has it can read who is on call. Treat it like a password:
- Replace link makes a new one. The old link stops working at once, for every calendar subscribed to it.
- Turn off ends the feed.
A schedule has one link at a time. Creating a link when one already exists changes nothing: someone has to choose Replace link. The API behaves the same way, and replaces only with replace=true.
Calendar apps refresh subscriptions on their own schedule, often every few hours, so a changed shift can take a while to show up there. The schedule’s page in Maple is always current.
API and MCP
- The API has the schedules under
/v2/alerts/oncall_schedules, with/{id}/oncall(who is on call at an instant),/{id}/shifts,/{id}/overridesand/{id}/calendar_feed. - The MCP server has
list_oncall_schedules,who_is_on_callandmanage_oncall_schedule.